In general, the stages of renovation in a new building from scratch are not very different from renovation of secondary housing and step by step look like this:
1. Develop a layout. Make a detailed work plan: this is not only about the layout of engineering systems (laying out pipes and electrical wiring, installing air conditioning and ventilation), but also the layout of flooring and tiles. If redevelopment is planned, agree in advance – otherwise there will be downtime.
2. Preparatory work. If necessary, we demolish unnecessary partitions, in a corner apartment we carry out thermal insulation of cold walls. And if you do not want to listen to your neighbors, then soundproofing as well.
Repair work is impossible without electricity – connect temporary “electricity” (in a small area, a portable one is enough). We also advise you to install temporary plumbing (sink, toilet), which you will not mind throwing away later.